The PIP-II project is an essential upgrade of Fermilab’s particle accelerator complex. It is the first U.S. Particle accelerator project with significant contributions from international partners. Research institutions in France, India, Italy and the UK will build major components of the new particle accelerator. The Fermi Gamma-ray Space Telescope (FGST), formerly called the Gamma-ray Large Area Space Telescope (GLAST), is a space observatory being used to perform gamma-ray astronomy observations from low Earth orbit.

Contents • • • • • • • • Fermi 1 [ ] The 69 MWe prototype Fermi 1 unit was under construction and development at the site from 1956 to 1963. Initial criticality was achieved on August 23, 1963.

On October 5, 1966 Fermi 1. Two of the 92 fuel assemblies were partially damaged. According to the, there was no abnormal radioactivity released to the environment. Fermi 1 was a design.

Fermi

It was capable of producing 200 megawatts thermal (MWt) power or 69 MW electrical power with 26% enriched metallic uranium fuel. The section of the reactor (core) was a 30 inch in diameter cylinder by 30 inches high and contained 92 fuel assemblies. Tamilwire mp3 songs free download. The core was surrounded by 548 additional assemblies containing depleted uranium. These assemblies were about 2.5 inches square by about 8 feet tall. Only the core section contained the enriched uranium while was placed above and below within the assemblies.

The core also contained 2 control rods and 8 safety rods. The plant was designed for 430 MWt and 125 MWe using a newer uranium oxide fuel, but the plant was closed before the fuel was ever ordered. The shield plug was a rotating part of the inner reactor vessel and sat over the fuel. It could be rotated in order to facilitate fuel movements.

The shield plug also provided radioactive shielding. During fuel loading, new assemblies were lowered down a tube into an adjacent Transfer Rotor which was integral with the reactor vessel. Then an Offset Handling Mechanism lifted the assembly from the Transfer Rotor and placed it into the vessel. Once all of the assemblies were loaded, a Hold Down Mechanism sat atop them so as to prevent them from moving upwards during operation.

Vray for sketchup 2013 free download 64 bit windows 7 The Hold Down Mechanism also contained temperature measuring devices (resistance temperature detectors) to monitor sodium outlet temperatures from the assemblies. The (primary) sodium which flowed through the core exchanged heat with a secondary sodium system which then exited the containment. The secondary sodium then passed through the tube side of 3 parallel steam generators and transferred heat to water on the shell side. The “once through” design produced superheated steam which turned the main turbine-generator. A 168 oil-fired boiler was added in 1966 to utilize the turbine-generator during periods when the reactor was not producing power. The main cause of the partial meltdown was due to a temperature increase caused by a blockage in one of the lower support plate orifices that allowed the flow of liquid sodium into the reactor. The blockage caused an insufficient amount of coolant to enter the fuel assembly; this was not noticed by the operators until the core temperature alarms sounded.